Mining Controls (MCI) is a
custom job shop situated on a 16 acre site near Beckley, WV. Our
56,000 square foot facility includes 45,000 square feet of
manufacturing space and 11,000 square feet for administrative
and technical staff. Also, construction is underway to expand
our manufacturing facility to 75,000 square feet. Our expansion
project is due to be completed by October 2012. Our new,
expanded facility will allow us to serve you better with
improved shipping times.
Our manufacturing and service
staff encompasses certified welders, electricians, transformer
winders and assemblers, painters, explosion proof lighting and
enclosure assemblers, and field service/test personnel. Included
in the MCI engineering staff are electrical engineers and
mechanical/electrical draftsmen that currently use Autocad 2009.
Gilbert Electrical Systems
(GES) has been a part of MCI for over twenty years. The
acquisition of GES in 1989 provided MCI instant access to the
industrial and utility markets for capacitor banks and harmonic
filtering banks, primary products of GES.
The acquisition in 1994 of K &
M Electrical Products expanded the MCI product line to include
empty electrical enclosures then referred to in the industry as
transclosures. GES does business with a diverse range of utility
and industrial customers. Utilities we serve range from small
cooperatives to large investor-owned electric and gas utilities.
Our industrial customers typically are large manufacturers
and/or big consumers of electricity interested in lowering their
electrical costs through power factor correction.
